Engineering project, for the extension of the first order road, for 30 kilometers, which begins in the city of Tecomán, Colima up to the limits of Michoacán by the coastal road.
Developing, topographic survey for the design of the extension, geotechnical studies for the study of soil mechanics, design of hydraulic drainage works, design and calculation of bridges, design of signaling, and regional modality environmental impact study and preparation of the executive project and investment budget, in a period of 4 months.
Picture: Highway section of first order from the city of Tecomán to the limits of with Michoacán.
